Stormwater

Please note that the Lewisburg Municipal Codes, Planning and Zoning, and Stormwater Departments have moved to 505 N. Ellington Parkway.

To enter our office area, please use the South end of the Lewisburg Gas Department building. Please do not use the main entrance. For Planning Commission and Historic Zoning meetings, please park around the back of the building and enter by the handicap entrance. If no one is there to let you in, please ring the doorbell.

NOTICE: Section 4(2)(a) of the Stormwater Management Ordinance, dealing with runoff reduction, is not currently being implemented by the City of Lewisburg, as allowed by the Tennessee Department of Environment and Conservation, Division of Water Resources.  If you have any questions, please contact Stacy Martin at (931) 359-4013.

Quick Menu

HOTLINE

The City of Lewisburg has developed a stormwater hotline. Call Stacy Martin at (931) 359-4013 to report illicit discharges, spills, and dumping into the stormwater system

MS4 (Municipal Separate Storm Sewer System)Annual Reports

Age
Age
Annual Report 2016-2017
Annual Report 2017-2018
Annual Report 2018-2019
Annual Report 2019-2020
Annual Report 2020-2021
Annual Report 2021-2022
Annual Report 2022-2023
Annual Report 2024-2025
Annual Report 2025-2026

Ordinance

The City of Lewisburg adopted an updated Stormwater Ordinance effective January 1, 2024. The updated ordinance addresses both stormwater quantity and quality. Any project that has not received prior preliminary plat, construction plan or site plan approval will be subject to the new requirements.
 
This version of the ordinance shall only be used for project in the preliminary plat, construction plan or site plan approval process prior to January 1, 2024.

Enforcement Response Plan

Permits

A Land Disturbance Permit is required when any activity on property that results in a change in the existing soil cover (both vegetative and non-vegetative) and/or the existing soil topography. Land-disturbing activities include, but not limited to, development, redevelopment, demolition, construction, reconstruction, clearing, grading, filling, and excavation. If the land disturbance is more than one (1) acre, a State permit will also be required.

Proposed Construction Site Plans

Stormwater Map

Public Information & Education

Stormwater Contact Information

Skip to content